Standard Design Factory @ Kinfra Parks
8-storey standard design factory block (1,20,000 sq. ft) utilizing vertical development for efficient space utilization.
Industrial/Manufacturing
Industrial/Manufacturing
Industrial/Manufacturing
|
Project Cost: 22.5 Cr
Project Cost: 22.5 Cr
Project Cost: 22.5 Cr
|
1,20,000 Sq Ft
1,20,000 Sq Ft
1,20,000 Sq Ft


This emphasizes technical competence in vertical development and floor load management.
A tendered contract for a 1,20,000 sq. ft, 8-storey standard design factory block.
Purpose: Done for housing industries like packaging units and light-duty industries.
Technical Solution: Vertical development was envisaged due to scarce land availability.
Technical Detail: Floor design and load patterns were designed to have a loading of 2.5 tons/m².
Key Metrics: The total cost of the project was ₹22.5 Crores and was completed in a timeline of 4 years.
This emphasizes technical competence in vertical development and floor load management.
A tendered contract for a 1,20,000 sq. ft, 8-storey standard design factory block.
Purpose: Done for housing industries like packaging units and light-duty industries.
Technical Solution: Vertical development was envisaged due to scarce land availability.
Technical Detail: Floor design and load patterns were designed to have a loading of 2.5 tons/m².
Key Metrics: The total cost of the project was ₹22.5 Crores and was completed in a timeline of 4 years.
Other Successful Projects

Corporate/Industrial
Project Cost: 50 Cr
Aptiv – Built To Suit Facility, Kochi
Built-to-Suit facility for corporate major Aptiv, rated as one of their most aesthetic and energy-efficient plants worldwide.
View Case Study

Corporate/Industrial
Project Cost: 50 Cr
Aptiv – Built To Suit Facility, Kochi
Built-to-Suit facility for corporate major Aptiv, rated as one of their most aesthetic and energy-efficient plants worldwide.
View Case Study

Public Sector
Project Cost: 45 Cr
Aralam Farm Comprehensive Development
Comprehensive development project for a tribal community, including major bridges, 11 km of roads, and 22 buildings.
View Case Study

Public Sector
Project Cost: 45 Cr
Aralam Farm Comprehensive Development
Comprehensive development project for a tribal community, including major bridges, 11 km of roads, and 22 buildings.
View Case Study

Academic/Institutional
Project Cost: 15 Cr
CUSAT Lakeside Campus, Excellence Centre
9-storied academic building completed in 2 years to upgrade the Centre for Marine Sciences to international standards.
View Case Study

Academic/Institutional
Project Cost: 15 Cr
CUSAT Lakeside Campus, Excellence Centre
9-storied academic building completed in 2 years to upgrade the Centre for Marine Sciences to international standards.
View Case Study

Corporate/Industrial
Project Cost: 50 Cr
Aptiv – Built To Suit Facility, Kochi
Built-to-Suit facility for corporate major Aptiv, rated as one of their most aesthetic and energy-efficient plants worldwide.
View Case Study

Public Sector
Project Cost: 45 Cr
Aralam Farm Comprehensive Development
Comprehensive development project for a tribal community, including major bridges, 11 km of roads, and 22 buildings.
View Case Study
Transform Your Energy Costs Today
Get a free consultation for your property. Our experts will design the perfect solar solution for your energy needs and budget.

Transform Your Energy Costs Today
Get a free consultation for your property. Our experts will design the perfect solar solution for your energy needs and budget.

Transform Your Energy Costs Today
Get a free consultation for your property. Our experts will design the perfect solar solution for your energy needs and budget.